A bill of materials lists every part of a pipeline with quantity, size, material and standard. It is the basis for ordering, prefabrication and the cost estimate.

What it contains

ColumnExample
Position1, 2, 3
DescriptionElbow 90° long radius, weld neck flange, spiral wound gasket
SizeDN 100 or NPS 4, with wall thickness or schedule
MaterialP235GH, ASTM A106 Grade B, 1.4404
StandardEN 10253, ASME B16.9, EN 1092-1
QuantityPieces or metres

Pipes, fittings and connection material

Pipes are listed in metres and are often rounded up to whole lengths for ordering. Fittings and flanges are counted per piece. Each flange joint needs a gasket and a bolt set; these are easily forgotten when a list is counted from a drawing.

Per drawing, spool or project

From bill of materials to cost estimate

The bill of materials is the basis of the material cost in an estimate. The welds of the line determine a large part of the installation hours, often expressed in inch-dia.

In FlowCAD3D

The bill of materials follows from the 3D model. Flanges, gaskets and bolt sets are added automatically, and welds are registered. Export to XLSX and CSV; the cost estimate uses the bill of materials with the article file and the price list of the company. More: Piping bill of materials from the 3D model.

Start with FlowCAD3D

Engineer € 169 and Fitter € 119 per user per month, excluding VAT; cancellable per month.

OrderPricingRequest a demo